Goa Legislative Assembly

गोवा विधानसभा

Smt. Delilah Lobo

Smt. Delilah Lobo

Constituency No/Name: 06 - Siolim

9022443114
08322952272
Bharatiya Janata Party
9022443114
08322952272

General:

Date of Birth: 23rd April 1977
Email: -NA-
FAX: -NA-

Contact:

Official: 9022443114
Residence: 08322952272
Personal: 9822127754

Address:

Office: -NA-
Permanent: H.No.181/15,Bhatti-vaddo,Parra-Bardez-Goa 403510
Present: H.No.181/15,Bhatti-vaddo,Parra-Bardez-Goa 403510

Election Details

24734

9699

1727

Indian National Congress

Refer Bulletin Part II No 71 dated 14-09-2022 with regards to Merger of 2/3rd of the Indian National Congress Legislature Party (“INC”) in to the Bharatiya Janata Party (“BJP”)

Eighth Legislative Assembly 2022
MEMBER
Committee on Delegated Legislation (Since 19 Jan 2023)
Eighth Legislative Assembly 2022
MEMBER
Committee on Goverment Assurances (Since 31 May 2022)
Eighth Legislative Assembly 2022
MEMBER
Budget Committee (31 May 2022 to 18 Jan 2023)
Eighth Legislative Assembly 2022
MEMBER
Commitee on Privileges (Since 09 Sep 2022)

Domestic and International air connectivity

“This House strongly recommends the Government to take effective measures to significantly enhance domestic and International air connectivity by increasing flight operations by strengthening operational, infrastructural and regulatory requirements to and fro from the State of Goa through Dabolim and Manohar International Airport, Mopa; to encourage airlines to introduce direct connectivity from emerging domestic cities and new international markets and by exploring appropriate facilitation mechanisms within the framework of existing policies to attract airlines to operate new routes to Goa and to ensure balanced utilization of both airports by strategically planning routes, timings and airline operations in order to maximize passenger convenience in order to strengthen tourism, trade and overall economic growth.”

Twelfth Session 2026

BUSINESS FOR THE DAY -5

Civil Aviation

Repair and reconstruction of Chapora Jetty

“This House strongly recommends the Government to take up the repair and reconstruction of Chapora Jetty and a detailed project report be prepared in this regards on top priority.”

Second Session 2022

BUSINESS FOR THE DAY -10

Tourism

Department of Tourism

Rural Self-Help Groups (SHGs)

“The attention of the House is drawn as regards the significant growth in the number of Rural Self-Help Groups (SHGs) in Goa and the need to ensure that these groups are functioning effectively and receiving adequate support. The Government to clarify that it has a regular mechanism to monitor the functioning, activities and performance of SHGs, and whether their efficiency and outcomes are periodically assessed and what platforms, markets, exhibitions, procurement opportunities and other avenues are being provided to SHGs to promote and sell their products and services, and what measures are being taken to ensure that these groups become economically sustainable and self-reliant.

Fourteenth Session 2026

BUSINESS FOR THE DAY - 2

Rural Development

Department of Rural Development

pdfMinisters Reply

Shortage of drinking water-Siolim Constituency

“Attention of the House is drawn as regards the anxiety in the minds of locals from the Siolim Constituency, as there is a Shortage of drinking water supply to the people of Siolim Constituency. Many households are receiving water supply for very limited hours, while some areas are not receiving any supply at all for days together. This situation has adversely affected daily household activities and has raised serious health and hygiene concerns. The steps the Government intends to restore a regular water supply to Siolim village”.

Thirteenth Session 2026

BUSINESS FOR THE DAY -4

Drinking Water

pdfMinisters Reply

Oxel and surrounding  villages - Bund/retaining wall

Fear and anxiety in the minds of Farmers from Oxel and surrounding  villages that the bund/retaining wall of the River in Oxel Village is in a dilapidated condition and may collapse anytime. In the year 2023,  some parts of the retaining wall collapsed and more than 50 farmers from Oxel and surrounding villages were affected. The steps  Government intends to take and the time frame within which the said work will be completed."

Seventh Session 2024

BUSINESS FOR THE DAY -9

Water Resource Department

pdfMinisters Reply

Balrath service employees

“fear and anxiety in the minds of parents and the commuting students, to the various aided and Government schools, due to sudden stoppage of Bal Rath services, as the Balrath service employees have threatened to go on indefinite strike due to unfulfilled demands. The measure the Government has taken in the matter.”

Fifth Session 2023

BUSINESS FOR THE DAY -1

Education

pdfMinisters Reply

Primary Health Centre (PHC) Siolim

I would like to draw the attention of the Hon’ble Health Minister to the urgent need for an X-ray machine and adequate medical staff at the Primary Health Centre (PHC), Siolim.
I kindly request the Health Department and the Hon’ble Health Minister to provide an X-ray machine at PHC Siolim and fill the vacant staff positions at the earliest, in the interest of the health and welfare of the local community.

Fourteenth Session 2026

BUSINESS FOR THE DAY - 3

Public Health

Public Health Department

EHN/Bifurcated numbers.

I would like to draw the attention of this House towards the growing fear and anxiety among the residents of my constituency regarding the non-provision of basic amenities such as water and electricity connections against their EHN/Bifurcated numbers.
Despite completing the required formalities and obtaining EHN/Bifurcated numbers, many families are still deprived of essential services like drinking water and electricity. This has created serious concern and uncertainty among the locals.

Thirteenth Session 2026

BUSINESS FOR THE DAY -3

Power

Shortage of Staff in Drinking Water Department

The attention of the House is drawn as regards shortage of satff as supervisors, valve operators, labourers etc in the drinking water department. The steps the Government intend to take in this matter.

Twelfth Session 2026

BUSINESS FOR THE DAY -3

Shortage of Beach Cleaning staff at Anjuna-Vagator and Chapora Area


Attention of the House is drawn as regards shortage of beach cleaning staff at Anjuna- Vagator and Chapora, beaches. The steps the Government intends to take in this regard and the time frame within which the Beach Cleaning staff will be deployed, to ensure that our beaches are garbage free.

Twelfth Session 2026

BUSINESS FOR THE DAY -2

Tourism

Department of Tourism

Shortage of Staff in Drinking water department

 
Fear and anxiety in the minds of locals from the Siolim Constituency as there is a Shortage of staff in the Drinking water department such as Supervisors, Valve Operators, labourers etc. The steps the Government intends to take and the time frame within which the vacant post will be filled.

Tenth Session 2025

BUSINESS FOR THE DAY -12

AMENDMENTS LIST -1

AMENDMENTS TO THE MOTION OF THANKS TO THE ADDRESS OF THE GOVERNOR

Session : Second Session 2022 | Sitting : BUSINESS FOR THE DAY -1

pdfView / Download 499.84 KB

005A - POWER SUPPLY TO SIOLIM CONSTITUENCY

WILL the Minister for Power be pleased to state:

a) whether the present load is sufficient to meet the requirement of power supply to Siolim Constituency; the details of load sanctioned and load Supply as on date to Siolim Constituency;
b) if not, the measures the Department has initiated to ensure adequate power supply in the Siolim Constituency;
c) whether any study has been carried to find out the shortage of power supply to Siolim Constituency; if so, furnish details; and
d) whether any study has been done to find out the frequent power cut issue in Siolim Constituency; if so, the action taken by the department to resolve the issue?

Answer:

 

QUESTION

 

ANSWER

 

*WILL the Minister for Power be pleased to State:

 

 

By Shri. Ramkrishna Dhavalikar, 

Minister for Power;

 

(a)  

whether the present load is sufficient to meet the requirement of power supply to Siolim Constituency; the details of load sanctioned and load Supply as on date to Siolim Constituency;

 

Madam,  

Yes.

The total load sanctioned in Siolim Constituency is 184.67MW. The details of load supplied/ peak loading recorded is as per the enclosed Annexure.

(b)

if not, the measures the Department has initiated to ensure adequate power supply in the Siolim Constituency;

 

Not Applicable in view of (a) above.

(c)

whether any study has been carried to find out the shortage of power supply to Siolim Constituency; if so, furnish details; and

 

Yes. There is no shortage of power supply in the Siolim Constituency. 

However, followings works are taken up for improving the power supply quality in the Siolim Constituency:

  • Proposed 2X20MVA, 33/11kV Indoor Type Badem Substation.
  • Laying of 11kV underground cables for proposed new feeders(06Nos) emanating from proposed 2x20MVA, 33/11kV, Badem Substation.
  • Supply, Erection, Testing and Commisioning 11kV 3 Core, XLPE armoured Cable of size 300 Sq. mm. for conversion of existing overhead 11kV Siolim Feeder emanating from 33/11kV Mapusa Sub-station.
  • Proposed augmentation of 33/11kV Anjuna Substation from 1X10MVA to 2X10MVA by providing additional 10MVA Power Transformer.

 

(d)

whether any study has been done to find out the frequent power cut issue in Siolim Constituency; if so, the action taken by the department to resolve the issue?

 

Yes.   

The measures taken up to improve the power quality are as below:

  • Regular preventive maintenance of substations.
  • Renovations and improvement of HT/ LT lines, upgradation of capacity of Power and Distribution transformers is carried out from time to time, based on the demand of consumers.
  • Regular maintenance of transformer centres, RMU, LV Panel is done and where needed, replacement is carried out. 
  • 11 kV & 33kV overhead feeders/ line are being converted to underground cabling to minimize faults caused by falling of trees/ tree branches, line snapping, and weather disturbances. 
  • Cutting of tree branches in the vicinity of the electric lines likely to touch/ fall, thereby causing damage to electrical network. Tightening/ replacement of loose/ weak jumpers. Restringing of loose    conductor. Replacement of old conductors.

 

Fourteenth Session 2026

BUSINESS FOR THE DAY - 3

Shri. Ramkrishna Alias Sudin Dhavalikar

Power

Electricity Department

005B - STAFF IN ELECTRICITY DEPARTMENT

*WILL the Minister for Power be pleased to state:

a) the sanctioned strength, present working strength and number of vacant posts of Linemen in the Electricity Department as on date under:
   i) Sub-Division III, Agarwada, catering to Siolim Constituency as on date;
   ii) Div-VI, Sub Div-III serving Verla-Canca Village;
  iii) Div-XVII- Sub.Div-II serving Assagao and Anjuna Village;
b) whether there is a shortage of staff such as Linemen and Line Helpers in:
  i) Sub-Division III, Agarwada, catering to Siolim Constituency;
  ii) Div-VI, Sub Div-III serving Verla-Canca Village;
  iii) Div-XVII- Sub Div-II serving Assagao and Anjuna Village;
c) the present working strength of Linemen/Line Helpers working during nighttime in:
  i) Sub-Division III, Agarwada, catering to Siolim Constituency;
  ii) Div-VI, Sub Div-III serving Verla-Canca Village; and
  iii) Div-XVII, Sub Div-II serving Assagao and Anjuna Village?

Answer:

Fourteenth Session 2026

BUSINESS FOR THE DAY - 3

Shri. Ramkrishna Alias Sudin Dhavalikar

Power

Electricity Department

005C - 33/11 KV ELECTRICITY SUBSTATION AT BADEM, SIOLIM.

*WILL the Minister for Power be pleased to state:

a) the present status of construction of the proposed 33/11 KV electricity substation at Badem, Siolim and the percentage of work completed as on date;
b) whether the work is progressing as per the approved schedule; if not, the reasons for the delay and the action taken by the Government and whether any extension of time or revision in the project cost has been granted; if so, the details thereof;
c) the expected date of commissioning of the substation; and
d) whether all allied works, including the 33 KV underground cable network and associated transmission infrastructure, have been completed; if not, the present status thereof?

Answer:

Sr. no 

Question

 

      Reply
 Will the Minister for Power be pleased to state: 

By Shri Ramkrishna Dhavalikar, Minister for Power

 

(a)

the present status of construction of the proposed 33/11 KV electricity

substation at Badem, Siolim and the percentage of work completed as on date;

 

The electrical works of the proposed 33/11 kV Substation at Badem, Siolim have been completed and the power transformers along with associated accessories were tested and charged on 01/06/2026.

 

 Approximately 95% of the civil works have been completed. The balance civil works, mainly comprising compound wall, painting and finishing works, are presently in progress.

 

(b)

whether the work is progressing as per the approved schedule; if not, the reasons for the delay and the action taken by the Government and whether any extension of time or revision in the project cost has been granted; if so, the details thereof;

 

 

The work was delayed due to the prolonged monsoon conditions experienced during the year 2025. 

 

The Work Order Value is Rs. 28,46,66,324/-

 

The revised estimated project cost is Rs. 32,20,63,275/-. 

 

An extension of time up to 30/09/2026 has been granted for completion of the balance works.

 

(c)

the expected date of commissioning of the substation; and

 

 

The Substation was test charged on 01/06/26. The balance work will be completed by 15/09/2026

 

(d)

whether all allied works, including the 33 KV underground cable network and

associated transmission infrastructure, have been completed; if not, the present

status thereof?

 

Yes, Completed

Fourteenth Session 2026

BUSINESS FOR THE DAY - 3

Shri. Ramkrishna Alias Sudin Dhavalikar

Power

Electricity Department

072 - TOURISM WORKS IN SIOLIM CONSTITUENCY

WILL the Minister for Tourism be pleased to state:

  1. the total number of works carried out by the department from 01/03/2022 till date in Siolim Constituency; furnish details such as name, cost and status of the work; and
  2. the total number of pending works since 01/03/ 2022 till date in Siolim Constituency, with details thereof and the reasons for pendency?

 

Answer:

Reply attached below

Fourteenth Session 2026

BUSINESS FOR THE DAY - 3

Shri. Rohan Khaunte

Tourism

Department of Tourism

073 - POWER DEPARTMENT WORKS IN SIOLIM CONSTITUENCY

WILL the Minister for Power be pleased to state:

  1. the total number of works carried out by the department from 01/03/2022 till date in Siolim Constituency, with details such as name, cost  and status of the work; and
  2. the total number of pending works since 01/03/ 2022 till date in Siolim Constituency, with details thereof and the reasons for pendency?

Answer:

Sr. no 

Question

 

      Reply
 Will the Minister for Power be pleased to state: 

By Shri Ramkrishna Dhavalikar, Minister for Power

 

(a)

the total number of works carried out by the department from 01/03/2022 till date in Siolim Constituency, with details such as name, cost and status of the work; and

 

 

Enclosed Annexure-A

 

 

(b)

the total number of pending works since 01/03/ 2022 till date in Siolim Constituency, with details thereof and the reasons for pendency?

 

 

Enclosed Annexure-B

 

Fourteenth Session 2026

BUSINESS FOR THE DAY - 3

Shri. Ramkrishna Alias Sudin Dhavalikar

Power

Electricity Department